All Tutorials will be E-mailed immediately (automatically) after the Payment and can also be Downloaded by clicking on Tutorial Bucket.
Please Check your Spam Email if you do not get the Tutorial.
Click Here to Submit New Syllabus (If course has changed or if you need help with any other course)
Shopping Cart
Your shopping cart is empty!
Categories
BUS 375 Final Exam Part 1 (2 Set)
$10.00

BUS 375 Final Exam Part 1 (2 Set)

This Tutorial was purchased 5 times & rated A+ by student like you.

 

This Tutorial contains following Attachments

  • BUS 375 Final Exam Part 1 (2 Set).docx

BUS 375 Final Exam Part 1 (2 Set)
 
 
Question 1 Most of the scheduling methods available today require the project manager to classify the project as either _______ constrained or ______ constrained.
Question 2 In reviewing the status of her project with top management, Shirley was told that there are only two programmers that she can use for her project. Her project is classified as __________ constrained.
Question 3 Gene is trying to order the concrete needed to continue his project. However, the supplier will not be able to deliver it until next week. This is an example of what kind of resource constraint?
Question 4 Resources are adequate, but demand varies widely over the life of the project. Delaying noncritical activities to lower peak demand on resources is known as resource
Question 5 All resource leveling techniques involve
Question 6 When a company will reduce the number of projects they have to manage internally to only core projects and send noncritical projects to contractors and consulting firms this is called
Question 7 Tony has realized that two activities in his project cannot be done at the same time because not enough resources are available. Activity 3 is critical and has a duration of 5 days. Activity 4 has 2 days of slack and a duration of 2 days. How will he decide which activity should be scheduled first?
Question 8 Which of the following is NOT a potential consequence of failing to identify limited resources before project implementation?
Question 9 In a Project Cost-Duration Graph, total project costs are a sum of
Question 1 0 The direct cost for completing an activity in the shortest time it can realistically be completed in is called its __________ cost.
Question 11 Which of the following projects would be least benefited if additional resources were added?
Question 12 It is going to cost $80,000 a day simply to house and feed a construction crew in the farthest reaches of northern Alaska. This would be an example of a situation requiring reducing the project duration due to
Question 13 Which of the following is NOT considered a project indirect cost?
Question 14 When reducing project duration, the duration for a project that is optimal is at the point where
Question 15 Before crashing, direct costs for an activity represent normal costs, which typically mean low-cost, efficient methods for completing the activity in a(n) ________ amount of time.
Question 16 The shortest possible time an activity can be completed realistically is called ___¬¬¬_____ time.
Question 17 The attempt to recognize and manage potential and unforeseen trouble spots that may occur when a project is implemented is known as
Question 18 The cost impact of a risk event occurring as a project proceeds through its life cycle tends to
Question 19 An uncertain event or condition that, if it occurs, has a positive or negative effect on project objectives is termed a
Question 20 Organizations use __________ in conjunction with work breakdown structures to help management teams identify and eventually analyze risk.
Question 21 Which of the following is NOT one of the steps in the risk management process?
Question 22 The risk management tool that is divided into three color-coded zones representing major, moderate, and minor risks is the risk
Question 23 _______________ focuses on how to respond to events that have a positive impact on a project.
Question 24 Risks that can result in a system or process that will not work are known as
Question 25 Tools such as a risk assessment form and a risk severity matrix are used to
 
Set 2
 
Question 1 Ed is looking over the actual results of projects and comparing them to what was estimated. He notices that the projects that took six months or longer to complete were noticeably more off the estimates. Which of the following factors is he recognizing?
Question 2 The salary of the project manager would be an example of what type of cost found in a project?
Question 3 Which of the following does NOT help describe a bottom-up estimating approach?
Question 4 Which of the following would best represent direct project costs?
Question 5 Accounting would be an example of which of the following costs typically found in a project?
Question 6 Which of the following is a good condition for top-down estimating?
Question 7 Which of the following methods is NOT considered a top-down approach to estimating project time and cost?
Question 8 Which of the following top-down methods is used when projects closely follow past projects in regard to features and costs of those features, and result in costs being assigned by percentages to major segments of the project?
Question 9 What is the relationship between organizational culture and estimating?
Question 10 Refining estimates may be necessary for a number of reasons. For example, people working on prototype development needing time to interact with the design engineers after the design is completed is a good example of
Question 11 Which of the following describes the consensus method?
Question 12 Rob is responsible for estimating a work package that has a significant amount of uncertainty associated with the time and cost to complete. Due to the uncertainty involved he will be making a low, an average and a high estimate. Rob is using which estimating approach?
Question 13 Companies are using which of the following for improving the estimating process for future projects?
Question 14 Tom is responsible for ordering hardware for a custom home his company is building. The contractor installing the hardware is scheduled to start in 5 working days, but the hardware is on backorder and will not arrive for another 9 working days. Fortunately, Tom has 10 days of slack; however, he shares this slack with the hardware installer. He will have to let the contactor know that the hardware will be ready 4 days later than expected and that the slack for the installer has been reduced by 4 days. Tom and the installer share 10 days of
Question 15 Which of the following correctly calculates the late start for an activity?
Question 16 System documentation cannot end until three days after testing has started. This is an example of which kind of lag?
Question 17 If testing cannot be completed any earlier than four days after the prototype has been built, what type of lag exists?
Question 18 Which of the following does NOT help describe a project network?
Question 19 Information to develop a project network is collected from the
Question 20 ________ activities are to be completed immediately following a particular activity.
Question 21 A(n) _________ activity has more than one dependency arrow flowing from it.
Question 22 The likelihood the original critical path(s) will change once the project is initiated is referred to as
Question 23 A sequence of connected, dependent activities is termed a(n)
Question 24 The critical path in a project network is the
Question 25 Which of the following correctly calculates the early finish for an activity?
 

Write a review

Order Id


Order Id will be kept Confidential
Your Name:


Your Review:
Rating:   A   B   C   D   F  

Enter the code in the box below:



Related Tutorials
$9.00

This Tutorial was purchased 5 times & rated A+ by student like you.

Greendale Project ReDux Due Week 8 and worth 90 points This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it..
$9.00

This Tutorial was purchased 3 times & rated A+ by student like you.

Project Schedule Due Week 10 and worth 150 points This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is w..
$9.00

This Tutorial was purchased 4 times & rated A+ by student like you.

Prior to completing the assignment, be sure to review the selected MS Project tutorial videos located in Week 2 of the Blackboard online course. Write a two to three (2-3) page paper in which you summarize your thoughts on Microsoft Project: 1. Give your opinion on how easy or difficult M..
$9.00

This Tutorial was purchased 3 times & rated A by student like you.

Assignment 2 Project Proposal Due Week 6 and worth 150 points You have been selected to be the project manager (for a project of your choice). The project you choose here will be used again in Assignment 4 (Week 6) and you may be asked to reference this project in subsequent weekly di..
$4.00

This Tutorial was purchased 3 times & rated B+ by student like you.

Week 1 Discussion: You as a Project Manager Many of you may believe that you have never worked in project management, but in reality, most of you have already at some point in your life. Think back to a time when you organized a key event (e.g., birthday parties, weddings, yard projects, house re..
$4.00

This Tutorial was purchased 4 times & rated No rating by student like you.

Week 2: You have been hired to lead a project (the project of your choice). As the project manager, you know it is important to get the project off to a good start. Using the tools provided in the required readings, provide a quick summary of your project, including the scope and objectives of yo..
$4.00

This Tutorial was purchased 4 times & rated No rating by student like you.

  Week 3: Last week, you were given the mantles of a project. You have properly defined your project. Now, it is time to estimate your budget. Using the information covered in the required readings, describe the budget you will need to support your project as well as how long it will tak..
$4.00

This Tutorial was purchased 2 times & rated No rating by student like you.

Week 4: You have added some new staff to your project team.  They have very little understanding of your project and you don’t have a lot of time to educate them on the project’s specifics. Using the tools provided in Online Lecture 1, describe how you plan to get your new staff members up t..
$4.00

This Tutorial was purchased 2 times & rated B+ by student like you.

Week 5 You are now deciding on resources for a project team. You have a choice to staff a team of resources who will be dedicated (or allocated) 100% to the project, or staff a team of resources who will be dedicated (or allocated) part time to your project; however, they will dedicate 100% to th..
$4.00

This Tutorial was purchased 3 times & rated No rating by student like you.

Week 6 You are ready to move forward with your project, but you realize you have not done a good job in identifying risks for your project. Using information that you learned from both online lectures, describe a key risk (either one that is technical, external, or organizational) that could impa..
$4.00

This Tutorial was purchased 3 times & rated No rating by student like you.

Week 7 Your business sponsor and customer are impressed with your project schedule, but due to some factors out of your / their control, you’ve been told to deliver your project early. Using the information from the readings, explain how you would go about assessing the possibility of delivering ..
$4.00

This Tutorial was purchased 3 times & rated No rating by student like you.

Week 8 Your business sponsor and customer informed you that you have to deliver your project much sooner than anticipated. When you break the news to your team, they are not happy with the decision for they are concerned that the project will now fail. Using the information you learned from readi..
$4.00

This Tutorial was purchased 3 times & rated No rating by student like you.

Week 9 Educating Your Business Sponsor on EVM Your business sponsor is not familiar with earned value management (EVM). You have been asked to provide him with a quick overview of EVM. Using the information covered in the online readings, suggest the top three (3) EVM performance measures you..
$4.00

This Tutorial was purchased 3 times & rated B+ by student like you.

  Week 11 Suppose you have graduated from Strayer University with your degree and you have been working in the management field for at least five (5) years. During your five (5) years, you have worked on a variety of projects. Now, you are thinking you are ready to pursue a certification..
$20.00

This Tutorial was purchased 3 times & rated B+ by student like you.

BUS 375 Week 1 Discussion BUS 375 Week 2 Discussion BUS 375 Week 3 Discussion BUS 375 Week 4 Discussion BUS 375 Week 5 Discussion BUS 375 Week 6 Discussion BUS 375 Week 7 Discussion BUS 375 Week 8 Discussion BUS 375 Week 9 Discussion BUS 375 Week 10 Discussion ..
$10.00

This Tutorial was purchased 3 times & rated A+ by student like you.

BUS 375 Midterm Exam Part 1 (2 Set)     • Question 1 Which of the following combinations represents the extremes of project organization? • Question 2 All of the following are organizational considerations when determining the right project management structure EXCEPT..
$10.00

This Tutorial was purchased 3 times & rated A+ by student like you.

BUS 375 Midterm Exam Part 2 (2 Set)     • Question 1 Which of the following is NOT one of the recommended guidelines for developing useful work package estimates? . • Question 2 Janet is forecasting how much money her department needs to support a new project. She esti..
$10.00

This Tutorial was purchased 5 times & rated A+ by student like you.

BUS 375 Final Exam Part 1 (2 Set)     • Question 1 Most of the scheduling methods available today require the project manager to classify the project as either _______ constrained or ______ constrained. • Question 2 In reviewing the status of her project with top mana..
$10.00

This Tutorial was purchased 4 times & rated A+ by student like you.

BUS 375 Final Exam Part 2 (2 Set)   • Question 1 Which of the following is used at Hewlett-Packard for building relationships with key players that will determine a project's success? • Question 2 One difference between project management and project leadership is that project..
$55.00

This Tutorial was purchased 4 times & rated A+ by student like you.

  Please check details of All Tutorial included Below   BUS 375 Assignment 1 MS Project Familiarization BUS 375 Assignment 2 Project Proposal BUS 375 Assignment 3 Greendale Project ReDux (Project Schedule and a Written Response) BUS 375 Assignment 4 Project Sched..
Tags:
Bus 375 © 2017 All Rights Reserved.Powered by:Ash Tutorial